POC: William Hahn/Jack Bash LAST UPDATED: 2004/12/21 09:39 EST
Marine Superintendent
University of Rhode Island
Graduate School of Oceanography
Narragansett, RI 02882
Tel: (401)874-6554
Fax: (401)874-6574
Email: marsup@gso.uri.edu
R/V Endeavor 2004 FINAL Schedule
=======================================================================
Final 2004 Schedule
=======================================================================
DAYS/AGENCY/
CRUISE MAP INDEX/AREA/ P.I./INSTITUTION/ PORTS STATUS/
DATES PURPOSE PROPOSAL NO. CLEARANCE
=======================================================================
08 JAN NA6// Polzin, Kurt/WHOI/ Narra 1/NSF/F
08 JAN Transit/load out OCE-0118401 Woods Hole
This cruise was mobilized in Nov 03 but was unable to leave Woods Hole because
of weather.
----------
9
10 JAN NA6/Instrument Polzin, Kurt/WHOI/ Woods Hole 7/NSF/F
14 JAN testing/ OCE-0118401 Woods Hole
15
16
17 JAN NA6// Detrick, Robert/ Woods Hole 4/NSF/F
19 JAN Mooring Recovery WHOI/OCE 0215670 Woods Hole
20 JAN NA6// Orr, Marshall/NRL/ Woods Hole 10/NAVY/F
27 JAN Navy Woods Hole
28,29
30 JAN NA6// Orr, Marshall/NRL/ Woods Hole 4/NAVY/F
02 FEB Instrument Recovery 20020619162345DO Narraganset
This cruise picked up the remaining Orr moorings in two legs. It was necessary
to return to Woods Hole to pick up a ROV and wait for a weather window. The
cruise terminated in Narragansett
----------
01 MAR NA6// Transit/URI/ Narraganset 3/NSF/F
03 MAR OCE 0136367 Norfolk
The transit to Norfolk was delayed by one day to allow for the departure of a
commercial ship at the berth in Norfolk
----------
4,5,6
07 MAR NA6,NA9/38N, 75W to 13 Cutter, G./ODU/ Norfolk 26/NSF/F
26 MAR /Phytoplankton studies OCE-0136367 Bridgetown Bermuda
27,28,29
30 MAR NA6,NA7// Transit/URI/ Bridgetown 9/NSF/F
07 APR Transit OCE 0136367 Narraganset
21 APR NA6// Fromm/NRL/ Narra 14/NAVY/F
04 MAY TREX N00014-03-1 Narra
This is a two ship operation Endeavor/Cape Henlopen
----------
11 MAY NA6/Sargasso/ Binder, B./U. of Narra 21/NSF/F
31 MAY Bacterial Growth Rates Geogia/OCE-0241740 Narra Bermuda
04 JUN NA4/Labrador Sea/ Drennan, W./RSMAS/ Narra 16/NSF/F
19 JUN ASIS Buoy Deployment/R OCE-0327271 Narra Canada
23 JUN NA6// Palka,Debra/NOAA Narra 20/NOAA/F
12 JUL Mammal and Turtle Abun Fisheries/NOAA Narra
16 JUL NA6// Palka, Debra/NOAA/ Narra 20/NOAA/F
04 AUG NOAA Narra
08 AUG NA6/Continental Shelf/ Duda, T./WHOI/ Narra 8/NAVY/F
14 AUG Mixing N00014-03-1-0335 Narra
15
19 AUG NA4/Labrador Sea/ Drennan, W./RSMAS/ Narra 15/NSF/F
28 AUG ASIS Buoy Deployment/R OCE-0327271 St. Johns Canada
29,30,31,1,2
03 SEP NA6// Transit/URI/ St. Johns N 12/NSF/F
14 SEP Transit/Mooring NSF Bergen Norw
One additional day has been added to facilitate the recovery of the Bower
mooring.
----------
15,16,17,18
19 SEP NA2,NA5// Rossby, Tom/URI/ Bergen, Nor 22/NSF/F
02 OCT Lagrangian Study OCE 0137037 Torshavn, F Norway,
3,4,5,6, Faroe Is.,
Iceland
Weather caused the ship to depart Bergen one day late. Two additional weather
were added to this cruise.
----------
07 OCT NA4// Transit/URI/ Torshavn, F 11/NSF/F
17 OCT Transit NSF Narraganset
27 OCT NA6// Madin, L/WHOI/ Narraganset 5/NSF/F
31 OCT Diving OCE0118444 Narraganset
Cruise was delayed by one day due to weather
----------
29 NOV NA6// Ullman, David/URI/ Narraganset 5/STATE/F
03 DEC Hydrographic Structure State RIEP Narraganset
Agency Funded Proposed TOTAL
------ ------ -------- -----
NAVY 36.0 0.0 36.0
NOAA 40.0 0.0 40.0
NSF 152.0 0.0 152.0
STATE 5.0 0.0 5.0
------ ----- ----- -----
TOTAL 233.0 0.0 233.0