POC:  Rose Dufour/Elizabeth Brenner       LAST UPDATED: 2005/11/03 14:44 EST
        SIO Ship Schedulers
      Scripps Institution of Oceanography
      University of California, San Diego
      9500 Gilman Drive
      La Jolla, CA 92093-0210
      Tel: (858) 534-2841
      Fax: NEW (858) 822-5811
      Email: shipsked@ucsd.edu

                       R/V Melville 2004 FINAL Schedule

=======================================================================
2/10 - Add Insurv inspection
2/17- adjusted Mercer and Johnson one day later
3/9 - Swift Intermediate port days noted; Adjusted Laske dates
4/1 - Adjust transit to Yokohama add two days
10/12- Adjusted Laske's departure date
=======================================================================
                                                              DAYS/AGENCY/
CRUISE  MAP INDEX/AREA/        P.I./INSTITUTION/  PORTS       STATUS/
DATES   PURPOSE                PROPOSAL NO.                   CLEARANCE
=======================================================================
29 DEC  IN5/to Cairns/         n.a./n.a./         Brisbane    2(Non-Op)// 
02 JAN  transit                n.a.               Cairns                

3,4,5,6,7
08 JAN  IN5/Fly River PNG/     Nittrouer, Aller, Goni/ Cairns      44/NSF/F
15 FEB  Chemical Oceanography  UW/OCE0220600      Port Moresb PNG,      
                                                              Australia 
Depart Brisbane 30 December 2003.
Cruise II
13 Jan arrive Port Moresby, am;
13 Jan depart Port Moresby, pm;
26 Jan arrive Port Moresby, am;
26 Jan depart Port Moresby, pm;
----------

16,17
18 FEB  IN5/PNG Fly River/     Driscoll, et al/   Port Moresb 23/NSF/F
09 MAR  piston coring, ACDP    SIO/OCE-0305779    Cairns                
Cruise III
1 March arrived Port Moresb,y am;
1 March depart Port Moresby, pm
----------

10,11
12 MAR  IN5/Ashmore,Pandora    Droxler, A./Rice/  Cairns      33/NSF/F
11 APR  Trough/Sediment Fluxes OCE0305688         Cairns      PNG       
3/20 arr. Port Moresby, am
3/20 dep. Port Moresby, pm
4/02 arr. Port Moresby, am
4/03 dep. Port Moresby, pm
work to be completed while the quiescent monsoon conditions are in effect
----------

12 APR  SP1/in port non-op/    na/SIO/            Cairns      1(Non-Op)/
12 APR  install ADCP           na                 Cairns      Other/F

13,14,15
16 APR  IN5/PNG- Fly River/    Goni, Nittrouer, Aller/ Cairns      46/NSF/F
27 MAY  Geology & mapping      UW/OCE0203351      Cairns      PNG       
28                                                                      
16 Apr - depart Cairns for Leg 1
(depart for one day trip with Naar multibeaml)
22 Apr - arrive Port Moresby, morning
(Thursday)


22 Apr - depart Port Moresby, afternoon, for Leg 2
06 May - arrive Port Moresby
(Thursday)

(Friday)
07 May - depart Port Moresby for Leg 3
18 May - arrive Port Moresby, morning


(Tuesday)
18 May - depart Port Moresby, afternoon, for Leg 4
27 May - end Cruise V in Cairns
----------

29 MAY  NP7//                  transit/SIO/       Cairns      14/NSF/F
11 JUN  transit                Ship Ops           Yokohama              

12,13,14
15 JUN  NP7,NP7A,NP8,NP9/30N,  Swift, J./SIO/     Yokohama    46/NSF/F
25 JUL  133E-118W/CLIVAR       OCE02-23869        Honolulu    Japan     
26                                                                      
cross date line, gain a day;
Robbins, P.-chief scientist
intermediate stop in Honolulu-arr. 25 July, dep. 28 July
(added 5 days for C. Measures)
----------

27
28 JUL  NP7,NP7A,NP8,NP9/30N,  Swift, J./SIO/     Honolulu    32/NSF/F
27 AUG  133E-118W/CLIVAR       OCE02-23869        San Diego   Japan     
intermediate stop in Honolulu-arr. 25 July, dep. 28 July
(added 5 days for C. Measures)
----------

02 SEP  NP9/off San Diego/     n.a./n.a./         San Diego   1(Non-Op)/
02 SEP  Sea Trials             n.a.               San Diego   Other/F
Will proceed to fuel pier after trials.
----------

10 SEP  NP12/32N 120W-22N 160/ Mercer, J./UW/     San Diego   33/NAVY/F
10 OCT  Long-range Ocean Acous N00014-97-1-0259   Honolulu              
11,12                                                                   
Short and long rang propagation to Worcester's moorings.
two ship ops; Baggeroer(Revelle) to occur simultaneously,
----------

13,14
15 OCT  NP9/30N 140W/          Johnson, K./MBARI/ Honolulu    27/NSF/F
08 NOV  Iron Analysis& Samplin OCE0325031         San Diego             
7 transit, 18 station, plus port=27
----------

15 NOV  NP9//                  NAVY/NAVY/         San Diego   0(Non-Op)/
19 NOV  INSURV Inspection      na                 San Diego   NAVY/F
At sea on the 17th.
----------

31 DEC  NP12/OFF Hawaii/       Laske/UCSD/SIO/    San Diego   1/NSF/F
25 JAN  OBS                    OCE-0002470        Honolulu/Hi           
26,27                                                                   
16 sci, 9 transit, 2 port, 1 arrv/dep=28 total
pick up scientist in Hilo, 7 January.
----------


Agency                    Funded            Proposed               TOTAL
------                    ------            --------               -----
 NAVY                      33.0                 0.0                33.0
 NSF                      266.0                 0.0               266.0
------                     -----               -----               -----
 TOTAL                    299.0                 0.0               299.0