POC:  Rose Dufour/Elizabeth Brenner       LAST UPDATED: 2004/12/27 16:58 EST
        SIO Ship Schedulers
      Scripps Institution of Oceanography
      University of California, San Diego
      9500 Gilman Drive
      La Jolla, CA 92093-0210
      Tel: (858) 534-2841
      Fax: NEW (858) 822-5811
      Email: shipsked@ucsd.edu

                    R/V Roger_Revelle 2004 FINAL Schedule

=======================================================================
11/21 shifted Constable start port from Salina Cruz to Puerto Caldera.
Moved off-load for Constable to the front to help avoid
Revelle-Atlantis/Alvin conflict.
Added one day to Chave/Recovery  inport for loading Jason II.
1/20/04 Remove Chave Sept. cruise and the Lau Basin cruises due to
shortfall at NSF. Shifted Nelson from Melville to Revelle, and Baggeroer
from New Horizon to Revelle.  Added Calif. Currents cruise.
3/8/04 - Advanced sailing of transit from Honolulu & the Cal. Current
cruise
3/30/04- Moved one day from Lonsdale's March cruise to his April cruise.
9/7- Add UC/Lonsdale days to Oct. transit
11/19 November California Current arrived 2 days early
Note:
All dates listed are local port time.
=======================================================================
                                                              DAYS/AGENCY/
CRUISE  MAP INDEX/AREA/        P.I./INSTITUTION/  PORTS       STATUS/
DATES   PURPOSE                PROPOSAL NO.                   CLEARANCE
=======================================================================
25,26,27
28 DEC  NP13/Galapagos Triple/ Gee, J./SIO/       Callao      34/NSF/F
02 FEB  Evaluating closure@ Ju OCE 0242205        Puerto Cald Peru,     
3                                                             Costa     
                                                              Rica,     
                                                              Ecuador   
7 days in calendar year 2003.  Total 41 days
(6.5 transit, 2 Lonsdale, Gee 27 sci, 4 port, 1.5 arr/dep)
----------

4,5,6,7,8
09 FEB  NP13/9N30 104W15/      Constable, S./SIO/ Puerto Cald 35/NSF/F
08 MAR  Marine Geophysics      OCE 0241597        Mazatlan              
9                                                                       
21 sci., 6.9 trans, 6 port, 1.5 arr/dep = 35
Should be on station afternoon of 13 Feb.
----------

10
11 MAR  NP13/Gulf of           Lonsdale, P./SIO/  Mazatlan    23/NSF/F
01 APR  California/multibeam   OCE 0203348        San Diego   Mexico    

24 APR  NP13/Gulf of Californ/ Lonsdale, P./SIO/  San Diego   16/NSF/F
14 MAY  dredging, multibeam, m OCE 0203348        San Diego   Mexico    
        NP9/Gulf of Californi/ Lonsdale, P./SIO/              5/STATE/F
        dredging, multibeam, m UC Ship Funds                            

26 MAY  NP9//                  Worcester, P./SIO/ San Diego   26/NAVY/F
18 JUN  North Pacific Acoustic N00014-97-10258    Honolulu              
19,20                                                                   

21,22,23
24 JUN  NP12/H2Observatory/    Chave, A./WHOI/    Honolulu    9/NSF/F
06 JUL  J-Box Recovery         OCE 0221832        Dutch Harbo           
        /transit/              n.a./n.a./                     7/NOAA/F
        to Dutch Harbor        n.a.                                     

7,8,9
10 JUL  NP5/Aleutians/         Rathburn, Keller, Stone, Yogodzinski/ Dutch Harbo 43/NOAA/F
16 AUG  Jason II, Multibeam, C various/NOAA-NURP  Honolulu              
17,18                                                                   
Leg 1 part 1:  Anthony Rathburn (co-PIs Levin & Gieskes) work area 53°30'N,
164°20'W & 53°30'N, 163°10'W.

Leg 1 part 2: Randy Keller (co-PIs Duncan) work area 52.0N, 160.9W & 53.0N,
161.2W

intermediate port stop at Dutch Harbor on 24 July.

Leg 2 part 3:PI-Bob Stone (Heifetz, Woodby, Reynolds, & Greene) work area N and
S flanks of the Aleutian Ridge 173W to 179.5E

Leg 2 part 4: PI- Gene Yogodzinski (co-PIs Keleman & Scholl)
work area 51.5N, 177W


[transit Dutch Harbor-Honolulu,(2040nm)
50 days (7 days transit charged on preceding cruise)includes science, transit
to and from Dutch Harbor, portdays including set up of JASON II, 4 days
minimum.]
----------

19
20 AUG  NP12/Off Big Island/   Hildebrand, J./    Honolulu    23/NSF/F
09 SEP  Sea Floor Geodesy      SIO/OCE 9819078    Honolulu              
10                                                                      

11,12
13 SEP  NP12/22.35N 159.57W; 3 Baggeroer, A./MIT/ Honolulu    29/NAVY/F
08 OCT  8N 146/Ocean Acoustics N0014              Honolulu              
9                                                                       

10 OCT  NP12/North Pacific/    n.a/SIO/           Honolulu    4/NSF/F
22 OCT  transit                na                 San Diego             
        //                     na/na/                         5/NAVY/F
                               na                                       
        NP12/Murray FZ/        Lonsdale, P./SIO/              4/STATE/F
        mutilbeam              UC ship funds                            
1600 ETA
----------

30 OCT  NP9/Off San Diego/     Checkley, D./SIO/  San Diego   1/STATE/F
30 OCT  Biological Oceanograph State Funds        San Diego             

02 NOV  NP9/Off California/    Goericke, R./SIO/  San Diego   18/STATE/F
19 NOV  Calif. Currents        Dir. Office        San Diego             

03 DEC  NP12/5N, 140W/         Nelson, D./OSU/    San Diego   29/NSF/F
02 JAN  Control by Fe, Si and  OCE 0322074        Papeete               
        SP5//                  na/na/                         4(Non-Op)/
                               OCE                            NSF/F
3,4
33 total
Actually 30 Days to Biocomplexity
3 days to OCE
----------


Agency                    Funded            Proposed               TOTAL
------                    ------            --------               -----
 NAVY                      60.0                 0.0                60.0
 NOAA                      50.0                 0.0                50.0
 NSF                      173.0                 0.0               173.0
 STATE                     28.0                 0.0                28.0
------                     -----               -----               -----
 TOTAL                    311.0                 0.0               311.0