POC:  Rose Dufour/Elizabeth Brenner       LAST UPDATED: 2008/01/16 13:05 EST
        SIO Ship Schedulers
      Scripps Institution of Oceanography
      University of California, San Diego
      9500 Gilman Drive
      La Jolla, CA 92093-0210
      Tel: (858) 534-2841
      Fax: NEW (858) 822-5811
      Email: shipsked@ucsd.edu

                    R/V Roger_Revelle 2007 FINAL Schedule

=======================================================================
2/26 Goldfinger Indonesian clearance still pending but appears very
likely.   If status is known at least one month prior to sailing, two
options will be considered a) approval results in the schedule as posted
b) denial results in Revelle continuing to a Singapore shipyard between
CLIVAR and Sager.

2/26 Port call for end of Sager is still to be determined.  Options are
Male, Maledives
2/26- Adjusted schedule to reflect one-day reductions in NIO time.  This
effects cruises from August-December.
5/5 Received Indonesian clearance for Goldfinger.
5/10-Adjusted end port for B. Ward to Goa.
6/15-  Shorten Sager cruise, added Bow Thruster Repair, and shorten
Naqvi's cruise by one day.
7/13/07-Cancel Sri-Lanka work for Charles-Change port to Marmagoa-Mahe.
Change drydocking to Durban.
8/29- Changed port for Naqvi/Ward from Muscat to Goa (Marmagoa)
=======================================================================
                                                              DAYS/AGENCY/
CRUISE  MAP INDEX/AREA/        P.I./INSTITUTION/  PORTS       STATUS/
DATES   PURPOSE                PROPOSAL NO.                   CLEARANCE
=======================================================================
17 DEC  SP4/29-50S, 149-120W/  D'Hondt, S./URI/   Apia, Samoa 29/NSF/F
27 JAN  multi-cores, multibeam ODP 0527167        Dunedin, NZ           
28,29,30                                                                
Apia to first sta. @ 165.5W 23.9W= ~2.5 days;
Wellington from last sta. @ 163W 47S= 3.79 days; Dunedin from last sta. = 4
days

33 sci;
6 transit;
1.5 arr/dep;
4 port;
45 total

cross date line-lose one day
----------

31,1,2,3
04 FEB  IN7/CLIVAR I8S & IN9/  Swift, J./SIO/     Dunedin, NZ 49/NSF/F
17 MAR  CTD, Rosette           OCE0223869         Fremantle,  Australia,
18,19,20                                                      NZ        
26 sci

13 transit from Dunedin
4 transit to Fremantle
5 port
plus 1.5 lost arrival/departure
----------

21
22 MAR  IN7/CLIVAR I8S & IN9/  Swift, J./SIO/     Fremantle,  45/NSF/F
02 MAY  CTD, Rosette           OCE0223869         Phuket, Tha Australia 
3,4                                                                     
40.5
4 port
Janet Sprintall-Chief Scientist
(Bangladesh, India EEZ approval with conditions not acceptable, needed to
w/draw)
----------

5,6
07 MAY  IN4/5S, 100E  14N, 91/ Goldfinger, C./    Phuket      43/NSF/F
14 JUN  piston cores, multibea OSU/OCE0526655     Phuket      Indonesia 
15,16                                                                   
30 sci.,
transit 8 (incl. arr/dep),
port 4,


May 21- likely Indonesian port stop Padang (Teluk Bayur) to embark/disembark
members in the science party.
----------

17
18 JUN  IN2/5N, 90E -25S,87E/  Sager, W./TAMU/    Phuket      51/NSF/F
06 AUG  MCS system, magnetomet OCE/ODP0550743     Singapore             

07 AUG  //                     Bow Thruster Repair/ Singapore   7(Non-Op)/
13 AUG  Bow Thruster Repair    SIO/n/a            Singapore   Other/P

14 AUG  IN1/Indian Ocean/      transit/na/        Singapore   6/NSF/F
21 AUG  transit to Arabian Sea na                 Goa                   
        /Indian Ocean/         Naqvi, W./NIO/                 2/Other/F
        transit to Goa         PO                                       

22
23 AUG  IN1/Arabian Sea/       Naqvi, W./NIO/     Goa(Marmago 28/Other/F
16 SEP  limitation of primary  NIO PO             Goa(Marmago           
17,18                                                                   
Part I of joint India-US program;
Intermediate port stop Goa, India 21 August
23.5 days of sci.,
4 transit
1 port (Goa)
1.5 arr/dep= total 30

(Oman clearance requested, but denied)
----------

19
20 SEP  IN1/Arabian  Sea/      Ward, B./Princeton Goa(Marmago 32/NSF/F
18 OCT  Chem Ocean.            /OCE0648026        Goa(Marmago           
19,20                                                                   
Part II of joint India-US program.  The plan is to load equipment in Goa before
the Naqvi cruise.
25 days science, 1.5 a/d, 2.3days transit, 3 port.
----------

21
22 OCT  IN3/Eastern flank of / Charles, C/SIO/    Marmagoa (G 13/STATE/F
04 NOV  Chirp, dredging, multi UC ship funds      Victoria, S Seychelles
        /Eastern flank of the/ transit/na/                    3/NSF/F
        support tranist costs  OCE                                      
5
6.6 days science; 5.9 days transit, 1.5 arr/dep, 2 port
(transit from Goa to Mahe via 5°12'S, 57°E= ~1686 nm)

[Marmagoa to Cape Town 4447 nm or 17 days total]
----------

6
07 NOV  IN1/Rodrigues & Magi / Fueri, E./SIO/     Victoria, S 21/STATE/F
25 NOV  Geology and geophysics UC ship funds      Port Louis, Mauritius,
26                                                            Seychelles
14 days science 3.5 days transit, 1.5 arr/dep, 2 port=21
----------

27
28 NOV  IN3/SW Indian Ridge/   MacKinnon, J./SIO/ Mauritius   10/STATE/F
09 DEC  internal waves         UC Ship Funds      Durban      So.       
                                                              Africa,   
                                                              Reunion   
        IN6//                  transit/n/a/                   3/NSF/F
        transit into Durban    n/a                                      
3 days charged to NSF to bring RR to Durban to begin CLIVAR;
7.4 transit, 3 days science, 1.5 arr/dep, 1 port; = 13 days total
(Mauritius clearance requested, but Embassy did not request)
----------

10 DEC  SA4//                  n.a./n.a./         Durban      29(Non-Op)/
07 JAN  drydock                n.a.               Durban      Other/P


Agency                    Funded            Proposed               TOTAL
------                    ------            --------               -----
 NSF                      261.0                 0.0               261.0
 Other                     30.0                 0.0                30.0
 STATE                     44.0                 0.0                44.0
------                     -----               -----               -----
 TOTAL                    335.0                 0.0               335.0