POC: Daniel S. Schwartz LAST UPDATED: 2004/01/08 18:12 EST
Manager of Marine Operations
University of Washington
School of Oceanography
Box 357940
Seattle, WA 98195-7940
Tel: 206-543-5062
Fax: 206-543-6073
Email: schwartz@ocean.washington.edu
R/V Thomas_G._Thompson 2003 FINAL Schedule
DAYS/AGENCY/
CRUISE MAP INDEX/AREA/ P.I./INSTITUTION/ PORTS STATUS/
DATES PURPOSE PROPOSAL NO. CLEARANCE
=======================================================================
28, 29
30 NOV NP10/Guam/ Tivey,M/WHOI/ Apra 13/NSF/F
12 JAN DSL-120 Ops OCE-0099327 Apra
12 (arrive), 13 (de-mobe)
Continuation of Tivey cruise begun in late 2002.
----------
14 JAN NP10/Guam/ Schwartz,D/UW/ Apra 26(Non-Op)/
08 FEB Maintenance n/a Apra Other/P
Maintenance: Engine overhauls and USCG Inspection. In-port time originally
expected to be 9 days but expands to 26 days due to cancellation of the Vietnam
expedition.
----------
09 FEB NP10/Marianas/ Embley,R/ Apra 25/NOAA/F
05 MAR Survey NOAA/PMEL/tbd Apra Japan (?)
"Ring-of-Fire" -- EM-300 Multibeam mapping and sidescan imaging of Marianas
backarc.
----------
06 MAR NP10/Guam/ Schwartz,D/UW/ Apra 7(Non-Op)/
12 MAR Maintenance n/a Apra Other/P
Maintenance: In-port time --after the NOAA mission-- due to cancellation of
the Vietnam expedition.
----------
13, 14, 15, 16
17 MAR NP10/So. Mariana Arc/ Fryer,P/Wheat,G/ Apra 55/NSF/F
04 MAY Magmagensis/ODP UH/OCE-0002584 Apra
05, 06
JASON II & DSL-120 Ops. Four days at Guam to mobilize ROV, then, 2 Days at end
to de-mobe. Includes G. Wheat borehole instrument recovery.
----------
07 MAY NP12/North Pacific/ (see following)/(m Apra 12/NSF/F
18 MAY Transit to Honolulu ultipl/(see below) Honolulu
Re-position from end of Fryer/Wheat (NSF) to beginning of Chave/Smith-H2O
(NSF). 13 days steaming but one day is gained, eastbound, so 12 days listed.
----------
19, 20
21 MAY NP12/Hawaii/ Chave,A/WHOI/ Honolulu 22/NSF/F
09 JUN H2O Observatory EAR-0004370 Seattle
NP12/H2O Observatory/ Smith,K/SIO/ 0/NSF/F
OCE-0002385
NP12/H2O Observatory/ Duennebier,F/UH/ 0/NSF/F
OCE-0124603
NP12/H2O Observatory/ Chave,A/WHOI/ 0/NSF/F
Permanent Geomag. Obs. OCE-0095389
JASON II. 2 days to mobe. 3.5 days to station, 10 science days, 6.5 days to
Seattle. (H2O cruises re-configured based upon A. Chave e-mail of 9/4/02.)
Multiple-PI days aggregated for simplicity.
----------
12 JUN NP9/Puget Sound/ McDuff,R/UW/ Seattle 4/STATE/F
15 JUN Student Instruction 74-0369 Seattle
PRISM cruise. (All or most JASON components will remain on board during this
cruise.)
----------
18 JUN NP9/Juan de Fuca/ Kelley,D/UW/ Seattle 11/NSF/F
01 JUL in-situ incubator OCE0221900 Astoria Canada
NP9/Juan de Fuca/ Becker,K/RSMAS/ 4/NSF/F
JASON II/ODP OCE-0083156
NP9/Juan de Fuca/ Jones,C/UW/APL/ 0(Non-Op)/
JASON II OCE-0136768 NSF/F
02
ROV ops. First of two Kelley cruises requested: 8 Sci days and 6 Sci days.
(Second cruise deferred into 2004.) Add'l 4 days for Kier Becker. (Extra 1
day for Chris Jones deferred into 2004.) Two transit days to/from site and then
one day at Astoria to de-mobe science.
----------
03, 04, 05
06 JUL NP9/Juan de Fuca/ Johnson,P/Voight,J/ Astoria 19/NSF/F
19 JUL LEXEN/JASON II UW/OCE-0085615 Astoria Canada
20, 21
JASON II: Includes 3 days at Astoria to mobe, transits and Voight days and two
days to de-mobe JASON at Astoria.
----------
22 JUL NP9/Juan de Fuca/ Delaney,J/UW/ Astoria 2/STATE/F
24 JUL transit & mobe ROPOS tbd Victoria Canada
NP9/NW Coast/ Embley,R/PMEL/ 1/NOAA/F
transit and mobe ROPOS tbd
1 day transit to Victoria, 7/22, then 2 days to mobilize ROPOS. (These
days--along with one de-mobe day after the NOAA Embley ROPOS cruise--will be
split between Delaney cruise and NOAA Embley cruise.)
----------
25 JUL NP9/Juan de Fuca/ Delaney,J/UW/ Victoria 32/STATE/F
24 AUG Neptune Observatory 74-0369 Astoria Canada
25
ROPOS and Academic Operations. Then, 1 day to de-mobe science at Astoria.
----------
26
27 AUG NP9/Juan de Fuca/ Embley,R/PMEL/ Astoria 14/NOAA/F
08 SEP ROPOS Ops at NeMO tbd Seattle Canada
NeMO. Reduced by NOAA an additional two days in conference call of Thurs., 20
March, having been previously reduced from 25 days to 16 days in Dec. of '02.
There was one science mobe day at Astoria (8/26) and then arrival at Victoria
on 9/8 to de-mobe the ROPOS ROV and Canadian scientists.
----------
09 SEP NP9/Juan de Fuca/ Delaney,J/UW/ Victoria 0/STATE/F
09 SEP transit & mobe ROPOS tbd Seattle
NP9/NW Coast/ Embley,R/PMEL/ 1/NOAA/F
transit and mobe ROPOS tbd
The 9th is utilized to finish off-load and then transit the ship from Victoria
to homeport, Seattle after the NOAA Embley NeMO cruise. This last day is
charged to NOAA as part of the equal distribution of the four transit/mobe days
for ROPOS between the two programs utilizing this vehicle (7/22, 7/23, 7/24,
and 9/9.)
----------
19 SEP NP9/H2O Observatory/ Chave,A/WHOI/ Seattle 27/NSF/F
15 OCT JASON ops. EAR-0004370 Seattle
NP12/H2O Observatory/ Chave,A/WHOI/ 0/NSF/F
Permanent Geomag. Obse OCE-0095389
Re-mobilize JASON II at UW dock 15 thru 18 September. (non-op days.) 2nd H2O
cruise. 15 science days requested (two ship ops with 'New Horizon') allowing
transit from, and return to Seattle.
----------
19 OCT NP9/Puget Sound/ McDuff,R/UW/ Seattle 6/STATE/F
24 OCT Student Instruction 74-0369 Seattle
16, 17, 18 Oct., de-mobe science and JASON at UW wharf (non-charge days.) Mobe
Student cruise.
----------
29 OCT NP9/Shipyard Availabil Schwartz,D/UW/ Seattle 39(Non-Op)//
06 DEC i/ABS & install new DP n/a Seattle
At Fairhaven Shipyard, Bellingham, WA: Updated DP system, ROADNET
communications suite, and GE alarm/engine control system will be installed.
Also, routine drydocking as per ABS requirements. Seatrials of the new
installations will take place prior to the transit back to Seattle.
----------
08 DEC NP9/Seattle/Puget Schwartz,D/ Seattle 5(Non-Op)//
12 DEC Sound/INSURV UW MarOps/ Seattle
INSURV Inspection.
----------
14 DEC NP9/Puget Sound/ McDuff,R/UW/ Seattle 3/STATE/F
16 DEC Student Instruction 74-0369 Seattle
PRISM stations, Puget Sound.
----------
21 DEC SP1/SW Pacific/ Pockalny,R/URI/ Seattle 11/NSF/F
06 JAN transit OCE-0137386 Easter Isla
JASON components to arrived at Seattle after annual maintenance on 17 Dec.
Mobilization occured on 17, 18, 19 & 20 Dec. Re-position from Seattle to Easter
Island for beginning of Pockalny cruise, which will commence on or about 6 Jan
2004. This transit will take a total of 17 days.
----------
Agency Funded Proposed TOTAL
------ ------ -------- -----
NOAA 41.0 0.0 41.0
NSF 174.0 0.0 174.0
STATE 47.0 0.0 47.0
------ ----- ----- -----
TOTAL 262.0 0.0 262.0