POC:  Daniel S. Schwartz                  LAST UPDATED: 2008/04/01 13:34 EDT
        Manager of Marine Operations
      University of Washington
      School of Oceanography
      Box 357940
      Seattle, WA 98195-7940
      Tel: 206-543-5062
      Fax: 206-543-6073
      Email: schwartz@ocean.washington.edu

                  R/V Thomas_G._Thompson 2007 FINAL Schedule

=======================================================================
1/09/08: Modify allocation of days on TN-213, Dec. 2007.

11/14/07: Addition of a day to the NOAA NDBC DART mooring transit/cruise
to recover an additional buoy off San Diego.

10/29/07: NUWC (Freeley) Cruise canceled by program office.  NOAA NDBC
Tsunami DART mooring work added for December transit south before
McGuire NSF mission.

10/02/07: Minor edits. No change to day count.

07/19/07: Correction to a transit entry.

07/18/07: Intra-cruise transit for the end-of-year McGuire cruise
spelled out in this version.

07/17/07: Add transit for Freeley and McGuire cruises.  Add McGuire
cruise.  Add one day for NEPTUNE Canada work at the end of July.

06/25/07: HOWE November Cruise cancelled.  Changes to late part of this
year pending.  A new version will be released soon.

05/14/07: After discussion with Program Manager, the NSF Bruland Alaska
cruise is now shown as starting from Seattle and ending up in Dutch
Harbor for a total of 39 days.  The return transit from Dutch Harbor to
Seattle, after the NOAA Stabeno cruise will be charged to that agency.
Total day count and departure/arrival dates remain the same.  Also, the
two days for Neptune Canada on the July/August academic cruise are
canceled due to the inavailability of the ROPOS ROV.  This changes the
total day count for the year--down from 257 to 255.

03/29/07: This version corrects the dates of the P.Franks cruise,
starting and ending one day earlier -- same duration of cruise.

02/05/07: Message from P.I. Freeley clarifies cruise length.  This
version adjusts schedule to reflect this information.

01/30/07: Delete two days from Weingart trip as per telecon of 1/29.
Move start of P. Franks cruise by two days later from Apr. 29 to May 1
to permit more time for de-mobe from prior cruise and mobe.  Add two
pending days for Neptune Canada to McDuff cruise in August. Delete
Pringle cruise shown as non-op previously as this cruise will now take
place in Sept. utilizing different platforms.  This permits earlier
start date for the NUWC Freeley cruise.  Total day count for the year
remains the same.

01/08/07: Clarify Ohman cruise needs, and break out transits separately.

11/27/06: Latest e-mail indicates PlusNet Project (Pringle et. al.) has
decided upon September dates - precluding use of Thompson.

11/25/06: This version tentatively adds two days to the Weingart project
and breaks out transit to/from Alaska for the Bruland & Stabeno legs.
Pringle cruise has not yet decided between the November dates shown on
this schedule and a September option that precludes use of the Thompson.

11/7/06: This version adds Pringle cruise in November but sequence and
dates of the Student Cruises, Howe, Pringle, and Freeley remain to be
finalized.

10/13/06: This version adds information provided by Freeley NUWC/ONR
Ship Time Request.
=======================================================================
                                                              DAYS/AGENCY/
CRUISE  MAP INDEX/AREA/        P.I./INSTITUTION/  PORTS       STATUS/
DATES   PURPOSE                PROPOSAL NO.                   CLEARANCE
=======================================================================
01 JAN  NP9/Alongside/Seattle/ Schwartz,D/UW/     Seattle     75(Non-Op)/
15 MAR  Maintenance            none               Seattle     STATE/P
10/03/06: Stand-down changed to begin in January when the Stein ONR cruise in
Jan. had been pulled.  Alongside maintenance availability.  Non-Op.  Install
new solid state relay cabinets for Z-Drives' steering.
----------

16 MAR  NP9/Puget Sound and    McDuff,R/UW/       Seattle     9/STATE/F
24 MAR  Jd/Student Instruction 74-0369            Seattle               
Critical Dates to fit with academic calendar.
----------

27 MAR  NP9/West Coast/        Ohman,M/SIO/       Seattle     4/NSF/F
30 MAR  Transit                OCE-0417616        San Diego             
Transit: reposition to Southern California for following Ohman cruise.
----------

31, 01
02 APR  NP9/CA Coast/          Ohman,M/SIO/       San Diego   23/NSF/F
21 APR  Coastal Pelagic        OCE-0417616        San Diego             
22                                                                      
01/08/07: Clarification messages exchanged with PI--Transits broken out
separately.  Twenty science days, two mobe days and one de-mobe day.
----------

23 APR  NP9/West Coast/        Ohman,M/SIO/       San Diego   4/NSF/F
26 APR  Transit                OCE-0417616        Seattle               
Return Transit: after Ohman cruise.
----------

30 APR  NP9/NE Pacific/        Franks,P/SIO/      Seattle     9/NAVY/F
08 MAY  Flourescence           tbd                Seattle               
3/29/07: Correct start date to coincide with Barnes departure (two-ship
project.)

1/30/07: Move start date back two days to allow adequate time for mobilization
and ship provisioning.

10/03/06: Messages with PI indicate flexibility as to exact dates within April.
Optimum Dates mid-April.  Seven science days, two days for transit to and from
stations.
----------

12 MAY  NP9/Ocn Sta Papa/      Wells,M/UCSC/      Seattle     28/NSF/F
08 JUN  Copper & Phytoplankton OCE-0526704        Seattle               
Ocean Station Papa, middle of Gulf of Alaska. Twenty-one days on station.
Assume 7 days total transit. Conversation with M. Wells on 9/7/06.
----------

10 JUN  NP9/Puget Sound and    McDuff,R/UW/       Seattle     6/STATE/F
15 JUN  Jd/Student Instruction 74-0369            Portland              
Critical Dates to fit with academic calendar. Onboard Chief Scientist Paul
Johnson.  Sea Grant collaboration.
----------

16 JUN  NP9/NE Pacific/        Weingart,J/        Portland    42/NAVY/F
27 JUL  ARDENT 4               JHU/APL/tbd        Seattle               
1/30/07: As per telephone call with PI, drop the two days added in November.
Change end date.

11/06:  As per telephone call in late November, have added two days
(tentatively) to the end of the project.    Involves coordination with other
vessels.
----------

31 JUL  NP9/Puget Sound and    McDuff,R/UW/       Seattle     13/STATE/F
13 AUG  Jd/Student Instruction 74-0369            Seattle               
        NP9/JdF/               Wilcock,W/                     1/Other/F
        ROPOS ops              NEPTUNE Canada/tbd                       
7/17/07:  NEPTUNE Canada has added one day to this cruise.
Arrive back at our facility day late due to bridge repair constraints.



ROPOS ROV required.  Mobe and de-mobe of ROV at Victoria included in these
days.

Critical Windows:  after Mar 17 to before Apr 6 = 10 days
then, between June 5 and Aug 15 = 12 days (with ROPOS)
then, in Oct. = 10 days.  (Personal Communications, 6/22/06)
----------

15 AUG  NP6/Alaska/            Bruland,K/UCSC/    Seattle     39/NSF/F
21 SEP  mixing-biomass         OCE-0526601        Dutch Hbr             
22                                                                      
5/14/07: Cruise will now start from Seattle and end in Dutch Harbor. Total
amount of science time unchanged. Shared dead-head transit with NOAA
eliminated.
----------

23
24 SEP  NP5/Bering Sea/        Stabeno,P/         Dutch Hbr   20/NOAA/F
11 OCT  FOCI                   NOAA/PMEL/tbd      Dutch Hbr             
12                                                                      
Autumn FOCI cruise.  Includes one mobe day and one de-mobe day at Dutch Hbr.
----------

13 OCT  NP9/Gulf of AK/        Stabeno,P/UCSC/    Dutch Hbr   7/NOAA/F
19 OCT  Transit                tbd                Seattle               
As of May 14th 2007: Northward transit was incorporated into the NSF Bruland
cruise.  Southbound transit is now NOAA shiptime.
----------

22 OCT  NP9/Puget Sound and    McDuff,R/UW/       Seattle     10/STATE/F
31 OCT  Jd/Student Instruction 74-0369            Seattle               
Critical Windows:  after Mar 17 to before Apr 6 = 10 days
then, between June 5 and Aug 15 = 12 days (with ROPOS)
then, in Oct. = 10 days.  (Personal Communications, 6/22/06)
Exploring possible split of October days to allow earlier start to subsequent
cruises--with remaining days to be used later on in the academic year.
----------

01 NOV  NP9/San Diego/         Schwartz,D/UW/     Seattle     33(Non-Op)/
03 DEC  USCG Inspection                           Seattle     STATE/P
Alongside period for installation of new electronic SCR Drive consoles for
Z-Drive propulsion units, plus sea-trial and USCG/ABS approval sign-off.  Also,
USCG annual COI inspection.
----------

04 DEC  NP9/West Coast/        McArthur,S./       Seattle     6/NOAA/F
11 DEC  Tsunami Buoys/Transit  NDBC/DART/n/a      San Diego             
        NP9/West Coast/        McGuire,J./NDBC/               2/NSF/F
        Transit                n/a                                      
        NP9/West Coast/        Maxwell,D./NOAA/               0/Other/F
        buoy recovery          email of 11/08/07                        
Jan.9, 2008: Allocation of days changed as per correspondence with SAIC and
NDBC.  Additional day now charged as a NOAA day.

Nov. 14: Add one day to recover additional buoy 120 nmi. off San Diego on the
way into port. This day is funded through SAIC.

Buoy Deployment and Transit: reposition ship to San Diego (originally for ONR
Freeley mission--now canceled--and the NSF McGuire mission.)  NOAA adds days to
accomplish replacement of the DART moorings off the U.S. West Coast.
Originally, NDBC arranged with the Navy to split the transit 5 days for NOAA
and 2 days for Navy.  With cancellation of the Navy work, the split is here
shown as 5 days for NOAA and 2 days for NSF.
----------

12, 13, 14
15 DEC  SP3/Equatorial         McGuire,J/WHOI/    San Diego   20/NSF/F
17 JAN  Pacifi/OBS & Multibeam tbd                San Diego             
18, 19                                                                  
7/18/07:  Intra-cruise transit to and from station requires approximately 8.5
days each way.  Seventeen science days on station -- for a total of 34 days:
Cruise thus ends on 17 Jan 2008, followed by 2 days for de-mobe.

7/17/07:  Transit will be broken out separately in later submission.  Station
is at Lat S 3.5 deg / Long 105 deg W running to Lat S 3.85 deg / Long 102.8 deg
W.   Two mobilization days shown.  Cruise will overlap into the beginning of
CY-2008: Seventeen science days needed on station -- mobe/demobe/transit will
be added into total later.
----------

27, 28, 29
?? ???  NP9/West Coast/Hawaii/ Freeley,M./NUWC/   San Diego   16(Non-Op)/
?? ???  Multibeam              tbd                San Diego   NAVY/F
11, 12                                                                  
10/29/07: Cruise CANCELED.

7/17/07: Message from P.I. -- "The worst case number of ship days required for
the survey is currently 3 mob, 11 on-site, and 2 demob.  We are currently only
scheduled for 12 days.  Is the ship available for an additonal 4 days?  Thanks,
Michelle."

2/05/07: Message from P.I. states total cruise length twelve days - ten science
and two mobe/de-mobe.

1/30/07: Pre-Cruise conference with PI held.
----------

?? ???  NP9/Pacific Coast/     Howe,B/UW/APL/     Seattle     22(Non-Op)/
?? ???  ALOHA mooring          OCE-0330083        San Diego   NSF/F
CANCELLED.  Work to be re-scheduled in 2008.

MBARI ROV required. Install large mooring. Sept. or Oct. desired. Monterrey
Bay.  4 days added to total for transits, 1 day for de-mobe.
----------

?? ???  NP9/Puget Sound/       McDuff,R/UW/       Seattle     7/STATE/F
?? ???  PRISM                  74-0369            Seattle               
Student Instruction. Dates and placement to be arranged later.
----------


Agency                    Funded            Proposed               TOTAL
------                    ------            --------               -----
 NAVY                      51.0                 0.0                51.0
 NOAA                      33.0                 0.0                33.0
 NSF                      120.0                 0.0               120.0
 Other                      1.0                 0.0                 1.0
 STATE                     45.0                 0.0                45.0
------                     -----               -----               -----
 TOTAL                    250.0                 0.0               250.0